单选题 NO.69 The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?

A、 It enables the propagation of network alerts across the bill of materials structure
B、 It links receipts from an alternative location in case of a shortage in the default location
C、 It propagates changed sales order priorities to the pegged planned orders
D、 It replaces fixed pegging relationships unless they have been created for stock
下载APP答题
由4l***81提供 分享 举报 纠错

相关试题

单选题 NO.14 When do you use variant bills of materials (BOM)?

A、When multiple material is have similar BOM
B、When a material has multiple BOM
C、When multiple material also have the same BOM
D、When a material has a configurable BOM

单选题 NO.6 You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

A、Top of Red Base
B、Top of Red
C、Top of Green
D、Top of Yellow

单选题 NO.10 What are the consequences if operation status Dispatched is set for a production order operation?

A、You can reschedule the operation using finite scheduling in the planning board
B、You can reschedule the order using material requirement planning
C、You can reschedule the operation using lead time scheduling
D、You can reschedule the order using lead time scheduling

单选题 NO.17 In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?

A、The item category of the component in the BOM
B、The MRP Type of the component
C、The Individual/Collective indicator of the component
D、The Planning Strategy of the finished product

单选题 NO.18 What is the first step in the MRP run?

A、BOM explosion
B、Source determination
C、Net requirements calculation
D、Lot size calculation

单选题 NO.15 You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

A、Manual planning without check
B、Forecast planning
C、Material requirements planning
D、Consumption-based planning

单选题 NO.21 The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?

A、Use the reorder point.
B、Use the minimum order quantity.
C、Use the fixed lot size procedure.
D、Use the MRP type for vendor managed inventory.

单选题 NO.1 During production order creation, several valid production versions are found. How does the system choose the product conversion?

A、Validity period or sales order
B、Lot size or material cost
C、Alphanumeric or quota arrangement
D、Planned order or material number