单选题 A ____ extracts heat from a heat source and rejects heat to air or water at a higher temperature for heating.

A、 heat generator
B、 chiller
C、 heat pump
D、 cold pump
下载APP答题
由4l***bo提供 分享 举报 纠错

相关试题

单选题 While the systems are in operation, the major task for the central control room operator is to ____ the status of these systems.

A、monitor.
B、change.
C、maintai
D、open

单选题 A unit may be started as soon as the common service systems are ____.

A、shut
B、new
C、replaced
D、operational

单选题 The ideal cycle that the working fluid undergoes in this closed loop is the Brayton cycle, which is made up of four internally ____ processes.

A、constant pressure
B、reversible
C、isentropic
D、adiabatic

单选题 A myriad of activities will be conducted during a unit startup, some in ____ and some in sequence.

A、parallel
B、unit
C、steam
D、operation

单选题 Starts are usually categorized as cold, warm or ____ starts.

A、hot
B、turbine
C、boiler
D、cool

单选题 ____ is the basis for process control in industry.

A、Controller
B、Sensor
C、Actuator.
D、Instrumentation

单选题 Operator interface devices are the ____ that a control room operator uses to monitor and control plant operation.

A、books
B、tools
C、decisions
D、equipments

单选题 Small gas turbines, with outputs of 35-45 MW, can achieve energy conversion efficiencies of up to ____ in power generation applications.

A、20%
B、30%
C、38%
D、28%