单选题 However it may not always be possible to develop a detailed ( ) for the construction at an early stage of the project.

A、 engineering
B、 time
C、 cost estimate
D、 structure
下载APP答题
由4l***qs提供 分享 举报 纠错

相关试题

单选题 He is in charge of the ( ) of materials.

A、buy
B、bought
C、achieve
D、procurement

单选题 They are going to tender for the ( ) of a new motorway.

A、construction
B、implementation
C、termination
D、instruction

单选题 We have collaborated on many ( ) over the years.

A、things
B、design
C、units
D、projects

单选题 The total ( ) of the project would be more than $240 million.

A、value
B、price
C、cost
D、debt

单选题 The Channel Tunnel project is the biggest ( ) engineering project in Europe.

A、civil
B、mechanical
C、building
D、electrical

单选题 The electric power industry is a critical part of economic ( ).

A、industry
B、construction
C、infrastructure
D、engineering

单选题 The contract's going to a British / Swedish joint venture, on a ( ) basis.

A、Design-Build
B、Turnkey
C、Build-Operate-Transfer
D、Public-Private-Partnership

单选题 The workmen are now taking down the ( ) round the building.

A、materia
B、tunnel
C、scaffolding
D、window